Project: BIM based Cyber-physical System for Bridge Assessment

Acronym cyberBridge (Reference Number: 10925)
Duration 01/05/2017 - 30/04/2020
Project Topic The project will develop a new cyber-physical bridge assessment system that will at low cost allow continuous online monitoring and system identification beyond modal analysis on the level of crack propagation and hence considerably improve prognosis of bridge deterioration. We will deliver a software system both as a product and as a service. Besides selling the system, continuous support and training, partial and complete bridge monitoring services and life cycle prognosis will be offered.
Network Eurostars 2
Call Eurostars Cut-Off 6

Project partner

Number Name Role Country
1 Cervenka Consulting s.r.o. Coordinator Czech Republic
2 Petschacher Software und Projektentwicklungs GmbH Partner Austria
3 Leonhardt, Andrä und Partner, Beratende Ing. VBI AG Partner Germany
4 Institut für Bauinformatik, TU Dresden Partner Germany